Summary
Introduction

Purpose of project
Shade
Installation type
Other
TREENET Inlet
Tree planting date
February 2020
Tree species
Cupaniopsis anacardioides (Tuckeroo)
Botanical name (Common name)
Number of Trees Planted
33
Tree Stock Size at Planting
100+ or ex-ground
Number of Trees Surviving
33
Survival Assessment Date
March 2020
Features
Stormwater infiltration
Owner of Site
Okeland Communities
Location Details
Location Address
Providence Parade, South Ripley
South Side of Providence Parade between Parkway Ave and Botany Drive in front of school
Council/LGA
Ipswich City Council
Technical Detail
If you require details not available here, see contact details.
Case Study Description
CUSP Landscape Architects consulted with a range of stakeholders and authorities who had conducted other trials before determining what application would best suit the site conditions/constraints. Key design factors:
- Sandy free draining soils
- Very low rainfall area
- Ripped and recompacted verge subgrade to 1500mm depth
- Full width pavement treatment to verge
- Trees set back on property boundary not back of kerb
- Value for money
Considering above, we decided that the Treenet R750 kerb inlet with a custom ‘mini’ reservoir sump was the most appropriate for the site conditions.
Design &/or as constructed detail
Depth of Engineered Space
Volume of Engineered Space
2.25m
Drainage Type
Natural
Drainage Type Resource/Image/Document
Surface Treatment
Growing Media Detail
Surrounding Site Soil Detail
Surrounding site soil detail Resource/Image/Document
Watering Regime
Manual
Maintenance Detail
N/A
Non-Technical Detail
Challenges Overcome
Satisfying pavement engineering standards
Stakeholder Feedback
Positive
Stakeholder Support for future projects of this kind
Yes
Funding Source
Private
Project Cost
Per tree
- Inlet – $900
- Soil works and sump – $500
- Tree – $500
Partners/Sponsors Information
Okeland Communities