Casey 4 Shopping Centre
Case Study Information
Study Details
Purpose of Project:
Other
Water management – Streetscape renewal and enhancement – Amenity – Shade
Installation Type:
Other
Permeable paving – Load bearing cells
Tree Planting Date:
January 2013
Tree Species:
Pin Oak
Quercus palustris
Number of Trees Planted:
12
Tree Stock Size at Planting:
Number of Trees Surviving:
12
Survival Assessment Date:
Features:
Other WSUD type
Owner of Site:
ACT Government
Study Contact Details
Contact Name:
Ben Gooden
Contact Phone
1300 066 949
Contact Email:
Location Details
Location Address:
Kingsland Parade, Casey ACT
12
Council/LGA:
ACT Government
Technical Detail
If you require details not available here, see contact details.
Case Study Description
Further Details
Design &/or as constructed detail
Depth of Engineered Space:
Volume of Engineered Space:
280m3
Drainage Type:
Resource/Image/Document:
CONNECT
Surface Treatment:
Growing Media Detail:
Surrounding Site Soil Detail:
Surrounding Area Resource/Image/Document:
CONNECT
Watering Regime:
Maintenance Detail:
Non-Technical Detail
Challenges Overcome:
Justifying the need for tree trench space
Stakeholder Feedback:
Positive
Stakeholder Support for future projects of this kind:
Yes
Funding Source:
Project Cost:
Partners/Sponsors Information: